TM 10-4510-209-13&P
UNIT MAINTENANCE
CONTAINERIZED LATRINE (CL) & CONTAINERIZED LATRINE SYSTEM (CLS)
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Table 1. Preventive Maintenance Checks and Services for Containerized Latrine (CL) &
Containerized Latrine System (CLS).
Item No. Interval
Item To Be
Procedure
Equipment
Checked Or
Not Ready/
Serviced
Available If:
NOTE
1
Before/After/Weekly 30 GPM Water
Pump Assembly
(CLS only)
Use of a step aid may be required.
Pump assembly or any
Remove pump cover and inspect
component damaged.
pump assembly (1) and components
Pressure switch (3)
for material damage. Check
damaged or wiring
mounting (2) for bends and cracks.
exposed.
Check all pipe connections on pump
Expansion tank (4) or
assembly for damage.
Ensure that all components are
pump motor (5) loose
in pump mounting.
secured to shelving (2).
Visible damage on any
component.
Class III water leaks.
Remove pump cover and check for
leaks on all pump assembly (1)
components.
Y strainer clogged.
Weekly
Remove pump cover and clean
pump inlet Y strainer (6). Refer to
procedures.
1
5
6
0033 00-1