TM 10-4510-209-13&P
UNIT MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
TIEDOWN PROVISIONS
REPLACE
INITIAL SETUP
Tools
Personnel Required
One (1)
Materials/Parts
Equipment Condition
CLS not stacked.
REPLACE
1. Remove three screws (1) retaining the recessed tie down (2).
2. Pry the tie down (2) from the CLS deck.
3. Install the replacement tie down (2) into the CLS deck.
4. Retain the tie down (2) with three screws (1).
1
2
0038 00-1