TM 10-4510-209-13&P
UNIT MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
HOSE ASSEMBLY
REPLACE
INITIAL SETUP
Tools
Personnel Required
One (1)
Materials/Parts
Equipment Condition
CL/CLS set up.
Water supply shut down.
General Purpose Detergent Spray Bottle (Item 18, WP 0118 00)
Blackwater 4-inch valve OFF.
Blackwater discharge connection
shut down.
REPLACE
Replace Damaged QD Hose Gasket
WARNING
When inspecting or servicing the hoses for the CL or CLS, always perform the required
maintenance on the freshwater hoses first. Do not handle freshwater hoses or fittings
directly after performing maintenance on blackwater hoses or fittings. Heavy-duty rubber
aprons, rubber gloves, safety goggles (chemical protection), and/or face shields
(chemical/biological protection) are required when in contact with wastewater or
contaminated surfaces. Material may contain bacteria or viruses that present a danger to
life or health.
NOTE
Replace the gasket on the pump priming QD fitting (1) as described in step 2. (CLS
only).
1. Replace damaged gaskets (2) and (3). A small screwdriver or knife may be necessary to remove the
gaskets.
0050 00-1