TB 750-105
Table 2. Inspection Standards - Continued
Item
Inspection standards
idlers, improper track tension; damaged sprockets; misaligned track frame; seperation of bonded rubber
track pads; missing or damaged rock, mud or dust bellows. Track must have at least 1/4 of original
grouser height left. Wheels must be properly bolted and rim free of dents.
Trailer landing gear .......
Must operate properly in the manner intended and be free of rust, cracks and broken parts.
Transmission and ........
Must be in good serviceable condition with oil level up to the full mark and free of any obvious visual or
transfer assemblies
audio apparent defects. There must be no broken, loose, dirty, or missing components, bolts, nuts or
screws. Watch for leaking seals, gaskets and clogged breathers.
Inspect components for breaks, cracks and broken welds.
Universal joints, drive ...
Joints must be properly lubricated, firm of movement and all bolts securely fastened. Drive shafts must
shafts, right angle
be straight and in proper alinement. Right angle drives must be properly bolted,
lubricated and free of water. On amphibians the propellers must be free of nicks and cracks. Blades are
not to be distorted. Front wheel disconnects should not have excess amount of play on the output shaft
bushing.
*Wooden components ..
Shall not be in such condition as to impair their structural strength. Those having cracks that do not affect
their strength are acceptable. Wood will crack and check from natural causes without necessarily having
its strength impaired.
*It is impossible to provide specific standards for some items. In these cases, reliance is placed on the inspector's experience with
identical or similar equipment. His judgement must be based on willingness to accept or reject equipment in like condition for the
users which his activity supports.
6. Operation Standards. a. Each vehicle as listed will be operated over a test course as follows:
Equipment
Desired test
Minimum test
Bridge Ferry,
AVL
5 Miles
3 Miles
Amphibian, Larc
V
Land
3 Miles
1 Mile
Water
3 Miles
2 Miles
XV
Land
1 Mile
1/2 Mile
Water
2 Miles
2 Miles
LX
Land
1/2 Mile
1/4 Mile
Water
1 Mile
1 Mile
Launcher,
AVL
3 Miles
1 Mile
Note: Mileage standards have not been established for other types of equipment.
b. All electric power generating equipment will be operated at 50 percent of the rated load for one hour and at 100
percent load for the remaining tests as follows:
Equipment
Size
Desired test
Minimum test
Gen Set
0 thru 10KW
4 hrs
2 hrs
Gen Set
15 thru 30KW
8 hrs
4 hrs
Gen Set
45KW or over
16 hrs
4 hrs
Gen Set
Gas Turbine, (All sizes)
8 hrs
4 hrs
c. Operating standards are set forth in
Table 3 and each equipment must successfully complete these tests (as
applicable) to qualify for overseas shipment or transfer between Army Activities.
Table 3. Operating Standards
Item
Operating standards
Operate under load to ensure proper operation. Observe all gages, controls and safety devices for proper
frigeration system, air
operation. Observe all sight glasses and flow gages for proper flow or refrigerant and/or lubricant.
purifier, air seperator,
Observe all drive belts for proper operation. Listen and watch for unusual noises, excessive vibration,
oxygen pump, CO2
overheating and loose or missing parts.
pump, auxiliary pump,
electric motors,
welding machines,
purifier.
Air system ...................
The system shall develop required pressure and the leakage rate shall not exceed that stated in the
6