TM 10--3510--221--10
0024 00--7
LAUNDRY ADVANCED SYSTEM
PREVENTIVE MAINTENANCE CHECKS AND SERVICES -- Continued
0024 00
TABLE 1. Operator PMCS -- Continued.
ITEM
NO.
INTERVAL
MAN--
HOUR
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
10
Before
Still condenser
Ensure fan guard (19) and inlet shroud (20)
are not blocked with debris.
Guard or
shroud are
blocked
Ensure heat exchanger inlet screens (21)
are not blocked with debris.
Screens are
blocked
11
Before
Inverter
enclosure
Ensure inlet door (22) and outlet door (23)
are not blocked with debris.
Doors are
closed or
blocked
12
Before
Still
Ensure doors (24) are closed and knobs
(25) are handtight.
Doors are open
and knobs are
not tightened
Ensure drain valves (26) are closed.
Valves are
open
Ensure manual valve (27) is closed.
Valve is open
13
Before
Electrical supply
Ensure external electrical power is
available. If power is supplied by TQG
ensure all PMCS has been done per TM
9--6115--644--10.
External
electrical power
is not available
Check main electrical cable (28) for
damage and proper connection at external
power source (29) and at LADS electrical
box (30).
Electrical cable
is damaged or
not connected
14
Before
Anti--foam supply
Check for adequate supply of anti--foam in
external containers (31) and (32).
Anti--foam
supply is < 1
gal
Shake anti--foam containers (31) and (32)
to mix solution.
Anti--foam has
clumps.
Ensure hand pump (33) is inserted
completely into container(31).
Hand pump is
not fully
inserted
Ensure pickup tube (34) is properly
connected at manual valve (27).
Pickup tube is
not properly
connected
Ensure pickup tube (35) is inserted
completely into anti--foam container (32).
Pickup tube is
not fully
inserted