TM 10--3510--221--24
0211 00--3/4 blank
DISCRETE INPUT PCB ASSEMBLY REPLACEMENT --
Continued
0211 00
INSTALLATION
1. ESD. Position new input PCB (20) on standoffs (21). Install, but do not tighten, five screws (18) and lock
washers (19).
2. ESD. Install, but do not tighten, screw (1) and lock washer (17).
3. ESD. Connect ground wire (2) then tighten screw (1).
4. ESD. Tighten five screws (18).
5. ESD. Connect wire harness (15) to J7 connector (16).
6. ESD. Connect wire harness (13) to J6 connector (14).
7. ESD. Connect wire harness (11) to J5 connector (12).
8. ESD. Connect wire harness (9) to J4 connector (10).
9. ESD. Connect ribbon cable (7) to J3 connector (8).
10. ESD. Connect ribbon cable (5) to J2 connector (6).
11. ESD. Connect wiring to J1 connector (4) as tagged, then tighten screw terminals (3).
12. Turn handle (22) CW, then close door (23).
13. Secure door (23) to main control enclosure (24) by tightening eleven latches (25).
14. Perform a DAILY START--UP and test LAUNDRY CYCLE (TM 10--3510--221--10). Verify normal operation.
END OF WORK PACKAGE
