TM 10--3510--221--24
0213 00--3/4 blank
OPTICALLY ISOLATED INPUT PCB REPLACEMENT --
Continued
0213 00
INSTALLATION
1. ESD. Connect ribbon cable (8) to connector J3 (9) on new optically isolated input PCB (4).
2. ESD. Connect ribbon cable (6) to connector J2 (7).
3. ESD. Slide optically isolated input PCB (4) into card cage (5). Make sure PCB is fully seated.
4. ESD. Slide retaining plate (2) forward and tighten two screws (1).
5. Turn handle (10) CW, then close door (11).
6. Secure door (11) to main control enclosure (12) by tightening eleven latches (13).
7. Perform a SYSTEM START--UP and test LAUNDRY CYCLE (TM 10--3510--221--10). Verify normal operation.
END OF WORK PACKAGE