TM 10--3510--221--24
0215 00--1
CPU PCB REPLACEMENT
0215 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanics (Item 1, WP 0272 00)
LADS water tanks must be drained and air
system vented (TM 10--3510--221--10).
LADS power must be shut off and door opened at
main control enclosure (WP 0112 00).must be
REMOVAL
1. ESD. Loosen two screws (1) and slide back retaining plate (2).
2. ESD. Lift up on ejection latch (3) and slide CPU PCB (4) up out of card cage (5).
3. ESD. Disconnect wire harness (6) from J1 connector (7).
4. ESD. Disconnect wire harness (8) from J4 connector (9).