TM 10-3510-222-10
2-11. PREPARATION FOR MOVEMENT- continued.
k.
Work Platform.
WARNING
Requires two people for lifting work platform components. Failure to observe standard lifting
procedures may result in serious injury to personnel.
(1)
Remove one step stairs (2 each) and place in wet washer bin.
(2)
Remove two step stairs and place in front of circuit breaker panel.
(3)
Remove short platform
(4)
Position washer and dryer platform s on side and remove quick release pins from platform brace.
(5)
Fold ends of platform in and install quick release pins.
(6)
Position washer platform on Laundry Unit.
(7)
Install rail assembly upright with quick release pin. (Pin head toward curb side.)
(8)
Position short platform on Laundry Unit and install long clamp.
(9)
Position dryer platform on Laundry Unit.
(10)
Install rail assembly upright with quick release pin. (Pin head toward street side.)
(11)
Install short clamp on washer and dryer platforms.
2-84