TM 10-3510-223-13&P 0029 00 0029 00-3 PROCEDURE 2 COVERS: Internal Component Power Loss INITIAL SETUP: CSSL set up but not in operation Maintenance LevelMaterials/PartsDirect Support None PERFORM TROUBLESHOOTINGPROCEDURES #1IS POWER AVAILABLE AT THE COMPONENTCIRCUIT BREAKER ?USING A MULTIMETER SET TO MEASUREAC VOLTAGE, CHECK THE AVAILABILITY OFPOWER AT THE COMPONENT BREAKER.(REFER TO WORK PACKAGE 0031 00)SWITCH BREAKER TO ON POSITIONAND OPERATE COMPONENT.(REFER TO WORK PACKAGE 0005 00)ARE COMPONENT OPERATING CONTROLSPROPERLY SET OR ADJUSTED ?SET OR ADJUST COMPONENTCONTROLS AS NECESSARY FOROPERATION.(REFER TO WORK PACKAGE 0005 00)CHECK POWER SUPPLY WIRING TO THECOMPONENT FOR PHYSICAL DAMAGE.REPLACE WIRING AS NECESSARY.REPLACE A DEFECTIVE COMPONENT ASDESCRIBED IN WORK PACKAGES 0031 00THROUGH 0043 00NOYESIS POWER AVAILABLE AT MAIN BREAKER ?USING A MULTIMETER SET TO MEASUREAC VOLTAGE, CHECK THE AVAILABILITY OFPOWER AT THE MAIN BREAKER.(REFER TO WORK PACKAGE 0031 00)YESYESNONO
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business