TM 10-3510-223-13&P
0029 00
0029 00-2
PROCEDURE 1 COVERS:
System Power Loss
INITIAL SETUP:
CSSL set up but not in operation
Maintenance Level
Materials/Parts
Direct Support
None
HAVE
QUALIFIED
PERSONNEL
(MOS
51R,
52C,
52D,
OR
52G)
CONNECT
100AMP
POWER
CABLE
PIGTAIL
END
TO
POWER
SOURCE
SUPPLYING
100AMP ,
208
VOLT,
3
PHASE
AC
POWER
(REFER
TO
TM
9-6150-226-13).
HAVE
100AMP
POWER
SUPPLY
CABLES
CONNECTED
TO
THE
CSSL
POWER
ENTRY
BOX
CONNECTORS
J1
AND/OR
J2.
(REFER
TO
WORK
PACKAGE
0005
00-7).
TURN
ON
POWER
AND
SWITCH
MAIN
BREAKERS
IN
BOTH
POWER
DISTRIBUTION
BOXES
TO
ON.
SWITCH
COMPONENT
BREAKERS
TO
ON
AND
RESUME
OPERATION
USING
A
MULTIMETER
SET
TO
MEASURE
AC
VOLTAGE,
CHECK
THE
AVAILABILITY
OF
POWER
AT
THE
FOLLOWING
POINTS
IN
SEQUENCE:
1.
AT
THE
PIGTAIL
CABLE
CONNECTION
TO
THE
POWER
SOURCE
2.
THE
CABLE
CONNECTOR
PLUG
3.
THE
MAIN
BREAKER(S)
(CHECK
FOR
PROPER
CONNECTION
OF
THE
VINYL
INSULATED
SUPPLY
WIRES
TO
THE
MAIN
BREAKER(S)
(THE
SEQUENCE
SHOULD
BE
BLACK
ON
THE
TOP ,
RED
AT
THE
CENTER
AND
BLUE
AT
THE
BOTTOM
CONNECTOR.
SEE
WIRING
DIAGRAM FIGURE
10 ,
.
4.
IF
NECESSARY
REMOVE
REAR
COVER
OF
POWER
ENTRY
BOX
AND
ENSURE
THE
SUPPLY
WIRES
ARE
TIGHTLY
CRIMPED
TO
THE
CONTACT
PINS
OF
THE
J1
AND
J2
RECEPTACLES.
5.
REPLACE
DEFECTIVE
COMPONENTS
AND
WIRING
AS
DESCRIBED
IN
WORK
PACKAGES
0031
00
THROUGH
0043
00,
AS
NECESSARY.
NO
YES
IS
CSSL
CORRECTLY
CONNECTED
TO
A
POWER
SOURCE
SUPPLYING
100AMP,
208
VOLT ,
3
PHASE,
AC
POWER
?
IS
POWER
AVAILABLE
AT
MAIN
BREAKERS
?
NO
YES