TM 10-3510-224-13&P
0035 00
8. Using the retained hardware, mount the new pressure switch (1) to the pump housing.
9. Slide the wires (2) through the switch mounting plate (3). Install the nut (4) over the wires and secure the nut.
10. Re-connect the tagged wires (2) in proper order.
11. Reconnect the fitting (5) and pressure line to the bottom of the pressure switch (1).
12. Install the pressure switch cover (6).
13. Using anti-seize tape, install new pressure gauge (7) into the pump housing.
1
2
3
5
7
8
3
4
7
5
6
2
4
9
6
1
END OF WORK PACKAGE
0035 00-2