TM 10-3510-224-13&P
0033 00
9. Install the items removed in the previous step to a new pump (1).
10. Apply antiseize to the reconnected copper joints.
11. Place the pump onto the mounting plate (2) by aligning the mounting bolts with the holes (3).
12. Reconnect the 1 ½ straight pipe section (5) to the pump inlet port (6).
13. Reconnect the 1 pipe stem (7) with the attached pipe section to the priming and outlet port (8). Install the
mounting bolts, washers, and worm clamp (9).
6
8
2
7
1
3
9
4
5
END OF WORK PACKAGE