TM 10-3510-226-23
0021 00
UNIT MAINTENANCE
CONTAINERIZED BATCH LAUNDRY
LINE REACTOR
INSPECT, TEST, REPLACE
INITIAL SETUP
Tools
Personnel Required
Tool Kit, General Mechanics: Automotive (WP 0086
Quartermaster and Chemical Equipment
Repairer 63J (1)
Materials/Parts
Equipment Condition
CBL set up
INSPECT
Inspect the Line Reactor
WARNING
This equipment operates at high voltages. Use extreme caution, observe all warnings,
and follow all safety procedures. Failure to observe safety precautions may result in
injury or death to personnel.
1. Disconnect power.
2. Remove screws retaining power input panel interior cover and remove power input panel interior
cover.
3. Inspect line reactor (Figure 1, Item 1) for loose connections, signs of burning, or material damage.
4. Install power input panel interior cover and retain with screws.
5. Connect power and monitor for normal operation.