TM 10-4510-207-14
2.6.1. Component Placement.
NOTE
The following is only a suggested layout of supplied components and may
differ from that required for any specific installation.
Three personnel required for assembly.
a. Remove components from storage containers and organize them by size and length to aid assembly. Be sure
to place components away from assembly area. When removing shower base (1), place them in assembly area
and arrange them as shown. If any components are damaged, notify supervisor.
b. Place all packaging material into storage containers then move containers to a suitable storage site.
c. Remove two clinching straps from each floor mat (2). Unroll and position as shown.
d. Position the pump assembly (3) and portable hot water system (4) (not provided) as shown. Refer to any
documentation covering the portable hot water system to find specific installation requirements for it.
2
4
1
ENTRANCE
LEAVE SEPARATED
TO ACCESS DRAIN
HOSE CONNECTION
1
3
2
2-9