TM 10-4510-208-13&P
UNIT MAINTENANCE
CONTAINERIZED SHOWER
SHOWER, ENCLOSED UNIT, SYSTEM
TEMPER & ISO BOOTWALL
REPLACE
INITIAL SETUP
Personnel Required
Tools
Four
Materials/Parts
Equipment Condition
Containerized Shower / Shower, Enclosed Unit,
System set up.
REPLACE
Replace an ISO Bootwall (Modified Endwall)
1. Strike TEMPER tent IAW WP 0005 00 or 0006 00 as applicable.
2. Replace the entire bootwall (1) when unserviceable. Refer to WP 0005 00 or 0006 00 as applicable.
1
END OF WORK PACKAGE
0038 00-1/(2 Blank)