TM 10-4510-209-13&P
OPERATOR MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
INTERIOR WALLS AND PANELS
REPAIR
INITIAL SETUP
Tools
Personnel Required
One (1)
Materials/Parts
Equipment Condition
CL/CLS set up and operating.
REPAIR
Repair Interior Wall or Ceiling Panel
Place tape (1) over cracked or torn area to prevent further damage to wall or panel (2) and to keep loose
panel sections from separating.
1
2
END OF WORK PACKAGE
0018 00-1/(2 Blank)