TM 10-4510-209-13&P
OPERATOR MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
CURTAINS
REPLACE
INITIAL SETUP
Tools
Personnel Required
One (1)
Materials/Parts
Equipment Condition
CL/CLS set up and operating.
REPLACE
Replace Curtains
NOTE
The use of a step aid may be required.
1. To replace curtain, unclip curtain (1) from hooks (2).
2. Install replacement curtain (1) on hooks (2).
2
1
0019 00-1