TM 10-4510-209-13&P
UNIT MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
FAUCETS
SERVICE, REPLACE
INITIAL SETUP
Tools
Personnel Required
One
Materials/Parts
Equipment Condition
Water inlet valves closed.
SERVICE
Clean Faucet Valve Assembly
1. Ensure water supply valves (1) to faucet are closed.
2. Loosen the Allen screw retaining the faucet handle (2), and remove the handle.
3. Remove and retain the adjustment washers (3).
4. Remove the nut (4) retaining the limit plates (5).
5. Remove the limit plates (5).
6. Remove the valve assembly (6).
7. Clean the valve assembly (6) of obstructions and dirt.
8. Ensure the O-rings (7) are in place and are in serviceable condition.
9. Install the valve assembly (6).
10. Install the limit plates (5), and retain with nut (4).
11. Install the adjustment washers (3).
12. Install the faucet handle (2), and retain with Allen screw.
13. Open water supply valves (1), and check for leaks.
0055 00-1