TM 10-8400-201-23
7-7. REPAIR AND MAINTENANCE
PREPARED FOR IRONING
Figure 7-7. Preparing a tear for patching
(3)
Quality control. Adjust heating, pressing, and cooling times as required for the specific iron being used. Check
the quality of the adhesive bond periodically and adjust heating times and temperatures of the iron as follows.
7-8