(1)
Remove nails and other obstructions from walls and floors.
(6) Run trial row and arrange containers to take up lengthwise space.
(2)
Place board across bunker wall opening when necessary.
(7) Place fiberboard sheets between stacks of different size containers.
(3)
Cover entire floor and bunker wall opening with fiberboard.
(8) Float Incomplete Layer
(4)
Use flush doorway protection.
(9) Keep load tight.
(5)
Load by the bonded block method.
NOTE spot flue front and rear line of containers
Figure 64. Summarizing recommended carloading practices.