TM 9-1005-237-23&P
2-5. SERVICE UPON RECEIPT OF MATERIEL. (cont)
Table 2-1. SERVICE UPON RECEIPT - M6 BAYONET-KNIFE WITH M10 SCABBARD, M7 BAYONET-
KNIFE WITH M10 SCABBARD AND M9 MULTIPURPOSE BAYONET SYSTEM (Cont)
Location
Item
Action
Remarks
4. M9 Multi-
M9 Multi-
a. Inspect for cracks, cut or
Refer to
purpose
purpose
worn fabric or web gear.
Bayonet
paragraph
Bayonet
2-11.C
System-
System-
b. Inspect for cracked or
for all
Scabbard
Scabbard
broken buckle of attaching
inspection
assembly.
criteria.
c. Inspect for cracked or
broken scabbard body.
d. Inspect for bent or broken
belt fastener.
e. Inspect for cracked or
broken screwdriver tip or
wire cutter plate/stud.
f. Inspect for broken or miss-
ing sharpening stone.
g. Inspect snaps to insure they
function.
h. Apply light film of lubricant
to metal components.
.
2-6. CHECKING UNPACKED EQUIPMENT.
a. Inspect the equipment for damage incurred during shipment. If the equipment
has been damaged, report the damage on SF Form 364,
Report of Discrepancy (ROD).
b. Check the equipment against the packing slip to see if the shipment is
complete. Report all discrepancies in accordance with the instructions of DA PAM
738-750.
c. Check to see whether the equipment has been modified.
2-4
