TM 10-3510-220-10
2-7.
SITE SELECTION, SETUP, AND ASSEMBLY. (CONT)
e. Remove and install dryer bin as follows:
(1) Remove four bolts and washers (1, figure 2-12) located inside dryer bin
(2).
(2) Remove dryer bin (2) and place it in front of dryer assembly (3).
(3) Install bolts and washers (1) removed instep (1) in the same locations
from which they were removed.
f.
Make dryer fuel line connections as follows:
WARNING
Use only specified fuel (item 10, app C). Failure to do
so may result in death or serious injury to personnel or
damage to equipment.
Figure 2-12. DryerBin Removal and Installation
2-43