TM 10--3510--221--10
0012 00--20
LAUNDRY ADVANCED SYSTEM OPERATION UNDER USUAL CONDITIONS
PREPARATION FOR MOVEMENT -- Continued
0012 00
PREPARATION FOR MOVEMENT -- Continued
J. Stow Awning and Railing -- Continued
11. Lower and stow railing (15) as follows:
a. Flip four support brackets (21) off of railing (15).
b. Pull quick--connect pin (22) out of gate (23) and ISO frame (12).
c. Swing gate (23) inside of railing (15) then secure with quick--connect pin (22).
d. Lower railing (15) to horizontal position.
15
22
23
23
12
22
15
21