TM 10--3510--221--10
0012 00--19
LAUNDRY ADVANCED SYSTEM OPERATION UNDER USUAL CONDITIONS
PREPARATION FOR MOVEMENT -- Continued
0012 00
PREPARATION FOR MOVEMENT -- Continued
J. Stow Awning and Railing -- Continued
10. Remove side railing (19) as follows:
a. Pull quick--connect pin (20) out of side railing (19) and ISO frame (12).
b. Lift side railing (19) out of hole in platform (8).
c. Install quick--connect pin (20) into side railing (19).
8
20
19
20
12
8