TM 10--3510--221--10
0012 00--18
LAUNDRY ADVANCED SYSTEM OPERATION UNDER USUAL CONDITIONS
PREPARATION FOR MOVEMENT -- Continued
0012 00
PREPARATION FOR MOVEMENT -- Continued
J. Stow Awning and Railing -- Continued
9. Remove six awning supports (5) as follows:
a. Pull quick--connect pin (14) securing awning support (5) to railing (15).
b. Lift awning support (5) then rotate upward to unhook t--bolt (16) from front support (17).
c. Stack awning supports (5) and secure together with straps (18).
d. Install six quick--connect pins (14) into top holes on railing (15).
15
14
5
18
5
18
16
17