TM 10--3510--221--24
0229 00--1
FLOW SWITCH REPLACEMENT
0229 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit
Rag, Wiping (Item 4, WP 0271 00
Tags (Item 9, WP 0271 00)
Tape, Anti--Seizing (Item 10, WP 0271 00)
Strap, Tiedown (Item 10, WP 0275 00)
Washer, Lock (Item 20, WP 0275 00)
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanics (Item 1, WP 0272 00)
LADS power must be shut off and door opened at
main control enclosure (WP 0112 00).
REMOVAL
1. Remove cover (1) from wire duct (2).
2. Tag and disconnect lead wires (3) at wire duct (2).
3. Remove tiedown straps (4) from lead wires (3).
4. Loosen clamp (5), then disconnect tube (6) from elbow (7).
5. Loosen clamp (8), then disconnect tube (9) from elbow (10).
6. Remove two screws (11), lock washers (12), and flat washers (13), then remove flow switch (14) from subpanel
(15).
7. Wipe any residual ant--foam or detergent main control enclosure (16) with a clean rag.
8. Remove elbows (7 and 10) from flow switch (14).
9. Clean anti--seizing tape from threads of elbows (7 and 10).