TM 10-3510-222-24
2-46. PIPING - continued.
(2)
Hot Water Ball Valve (11).
(a)
Remove piping.
(b)
Remove pipe (19) from ball valve (11).
(c)
Remove ball valve (11) from pipe nipple (18).
(d)
Remove elbow (37) from ball valve (11).
(e)
Clean male threads of pipe nipple (18) and pipe (19) with wire brush.
(f)
Apply antiseize compound to male threads on pipe nipple (18) and pipe (19).
(g)
Install elbow (37) on new ball valve (11).
(h)
Install ball valve (11) on pipe nipple (18).
NOTE
Arrow on bracket of ball valve (11) should be pointing down.
(i)
Install pipe (19) on ball valve (11).
(j)
Install piping.
(3)
Cold Water Ball Valve (12).
(a)
Remove piping.
(b)
Remove pipe (24) from ball valve (12).
(c)
Remove ball valve (12) from pipe nipple (23).
(d)
Remove elbow (38) from ball valve (12).
(e)
Clean male threads of pipe nipple (23) and pipe (24) with wire brush.
(f)
Apply antiseize compound to male threads on pipe nipple (23) and pipe (24).
(g)
Install elbow (38) on new ball valve (12).
NOTE
Arrow on bracket of ball valve (12) should be pointing to the front
of the Laundry Unit.
(h)
Install ball valve (12) on pipe nipple (23).
(i)
Install pipe (24) on ball valve (12).
(j)
Install piping.
(4)
Quick Coupling Half (6).
(a)
Remove piping.
(b)
Remove quick coupling half (6).
(c)
Clean threads of bushing (22).
(d)
Apply antiseize compound to male threads on bushing (22).
(e)
Install new quick coupling half (6).
(f)
Install piping.
2-113