TM 10-3510-222-24
3-57. SKIRT AND LEVELING ARM - continued.
c. INSTALLATION (Figure 3-52)
(1)
Position skirt (16) and leveling arm (17) on trailer.
(2)
Install three screws (7), flat washers (8), sleeve (9), lockwashers (6) and nuts (5).
(3)
Install six screws (3), flat washers (4), lockwashers (2) and nuts (1).
(4)
Install two clamps (12), four lockwashers (11) and bolts (10) to secure control panel (18) to skirt (16).
(5)
Feed wires extending from conduit (15) through hole in skirt (16) and secure conduit (15) with nut (13)
and gasket (14).
(6)
Install drive unit (Para 3-46).
(7)
Install motor (Para 2-42).
(8)
Install extractor piping (Para 2-37).
3-135