TM 10-3510-223-13&P
0008 00
0008 00-2
PROCEDURE 1 COVERS:
Loss of Power
INITIAL SETUP:
CSSL set up but not in operation
Maintenance Level
Materials/Parts
Operator
None
IS POWER SOURCE CONNECTED TO
THE OUTSIDE OF THE CSSL POWER
ENTRANCE BOX?
HAVE MOS 51R, 52C, 52D, OR 52G
QUALIFIED PERSONNEL CONNECT
POWER SOURCE. ATTEMPT TO START
APPLIANCES. IF STILL INOPERATIVE,
CONTINUE PROCEDURE.
SET MAIN CIRCUIT BREAKER TO ON.
ATTEMPT TO START APPLIANCES. IF
STILL INOPERATIVE, CONTINUE
PROCEDURE.
ARE INDIVIDUAL CIRCUIT BREAKERS
SET TO ON ?
SET INDIVIDUAL CIRCUIT BREAKERS TO
ON. ATTEMPT TO START APPLIANCES.
IF STILL INOPERATIVE, CONTINUE
PROCEDURE.
SET AND ADJUST COMPONENT
OPERATING CONTROLS TO THE
DESIRED MODE OF OPERATION (ON/
OFF, HEATER CONTROL, etc.)
IF APPLIANCES ARE STILL INOPERATIVE
NOTIFY DS MAINTENANCE
ARE MAIN CIRCUIT BREAKERS IN PANEL
#1 AND #2 SET TO ON ?
NO
YES
IS PHASE INDICATOR LIGHT IN CIRCUIT
BREAKER BOX #1 ON ?
NOTIFY DS MAINTENANCE. AFTER
CORRECTIVE ACTION, ATTEMPT TO
START APPLIANCES. IF STILL
INOPERATIVE, CONTINUE PROCEDURE.
NO
NO
NO
NO
YES
YES
YES
YES
ARE EQUIPMENT OPERATING
CONTROLS PROPERLY SET OR
ADJUSTED?