TM 10-3510-223-13&P
0011 00
0011 00-2
washer/dryers as well as the cargo container are free of packing materials and dunnage. The CSSL
should be serviced prior to operation in accordance with PMCS Table 1, WP 0009.
CSSL Components. Prepare separate CSSL components for operation as described in the applicable
technical manuals. (Refer to work package 0002 00 and 0044 00 for a listing of pertinent publications).
Prepare washer/dryers as described in the commercial literature provided.
END OF WORK PACKAGE