TM 10-3510-223-13&P
0012 00
0012 00-4
PROCEDURE 3 COVERS:
No water pressure
INITIAL SETUP:
CSSL set up but not in operation
Maintenance Level
Materials/Parts
Unit
None
CONNECT THE 50 FT, 2 INCH DIA., OR GARDEN
FRESHWATER SUPPLY HOSE TO THE INLET
PANEL AS DESCRIBED IN WORK PACKAGE 0005
00. OPEN GATE VALVE BEHIND INPUT PANEL
CHECK IF COMMERCIAL WATER SOURCE IS
SUPPLYING WATER. ENSURE 3,000 GALLON
FRESHWATER TANK CONTAINS SUFFICIENT
WATER. CHECK HOSE CONNECTION TO
SOURCE.
ENSURE FRESHWATER PUMP POWER CORD IS
PLUGGED INTO THE CURBSIDE RACE WAY
OUTLET AND CIRCUIT BREAKER #28 IS SET TO
ON. LIFT AND HOLD LEVER ON PRESSURE
SWITCH UNTIL PRESSURE GAGE READS 20LBS.
(REFER TO WORK PACKAGE 0005 00)
FRESHWATER PUMP REQUIRES PRIMING.
NOTIFY DIRECT SUPPORT MAINTENANCE.
NO
YES
NO
NO
NO
YES
YES
IS COMMERCIAL SOURCE TURNED ON? OR, IS
FRESHWATER TANK (IF USED) FULL AND 2 "
WATERHOSE PROPERLY CONNECTED TO IT?
IS FRESHWATER PUMP OPERATING ?
AFTER RUNNING PUMP FOR SEVERAL MINUTES,
IS PRESSURE ON THE PRESSURE GAGE
INCREASING?
IS 50 FT, 2 INCH DIA. FRESHWATER HOSE
PROPERLY CONNECTED TO CSSL FRESHWATER
INPUT PANEL? OR, IS MUNICIPAL SOURCE
CONNECTED WITH GARDEN HOSE? IF GARDEN
HOSE IS CONNECTED, IS GATE VALVE BEHIND
FRESHWATER INPUT PANEL OPEN?
YES
OPERATE CSSL