TM 10-1670-300-20&P
TO 14D1-2-469-2
NAVAIR 13-1-42
2-15.
SLING ASSEMBLY, EQUIPMENT ATTACHING.
This task covers:
a.
Inspect
b.
Repair
c.
Replace
INITIAL SETUP
Tools:
Sewing machine
Materials/Parts:
Nylon webbing
Quick fit connector
INSPECT
Inspect sling assembly m accordance with Table 2-1 and paragraph 2-10.
REPAIR
Repair sling assembly m accordance with paragraph 2-11, Table 2-2 and original construction details.
REPLACE
Replace unserviceable equipment attaching sling with a serviceable one from stock.
2-31