TM 10-1670-300-20&P
TO 14D1-2-469-2
NAVAIR 13-1-42
(1)
Place one mark (1) on lowering line (2) at edge of retainer/stow flap (3).
(2)
Place a second mark (4) 72 in. away from first mark (1).
(3)
Carefully cut lowering line (2) at marks (1) and (4) and discard removed section of webbing (5).
(4)
Sear both cut ends of lowering line (2) at (1) and (4).
(5)
Position cut edge (1) of lowering line (2) on retainer/stow flap (3), aligning it with right edge of retainer/stow
flap (3). Ensure that pile tab on cut lowering line section is facing down directly over existing portion of
lowering line.
(6)
Secure cut lowering line section (2) to retainer/stow flap by stitching with three point WW stitch pattern.
c.
Marking New Lowering Line. Mark outside of retainer/stow flap with a one inch stencil and black ink with the
letters "MFF ONLY".
REPAIR
a.
Repair Lowering Line. Repair lowering line in accordance with paragraph 2-11, Table 2-2 and original
construction details.
2-33