TM 10-1670-300-20&P
TO 14D1-2-469-2
NAVAIR 13-1-42
b.
Replace Hook/pile Fastener Tape on Retainer/Stow Flap.
(1)
Remove unserviceable hook fastener tape (1) and/or pile fastener tape (2), as required.
(2)
Cut a 2-mnch length of hook fastener tape (1) or a 4-mnch length of pile fastener tape (2) as required.
(3)
Place a mark 3/8 inch from retainer binding (3) on folded loop end of lowering line (4).
(4)
With hook side facing up, align 2-inch hook fastener tape (1) with 3/8 inch marking, and stitch with a
single box stitch.
(5)
Place a mark 1-inch from the binding edge (5) on pile flap retainer (6) at folded loop end of lowering
line (4).
(6)
With pile side facing up, position edge of 4-inch pile fastener tape (2) on 1-inch marking with other
end extending over binding edge (5) Stitch to pile flap retainer (6) with a single x-box stitch.
REPLACE
Replace unserviceable lowering line with a serviceable from stock.
2-34