TM 10-1670-300-20&P
TO 14D1-2-469-2
NAVAIR 13-1-42
(7)
Remove frangible cap (1) from main spring and plunger barrel (2) and set it aside.
(8)
Loosen power cable housing knurled nut (3).
(9)
Push power cable (4) toward FF-2 Release until power cable rod (5) is exposed at opening of main spring
and plunger housing (2).
(10) Insert awl or special tool through hole on power cable rod (5).
(11) While holding awl or special tool and rod power cable (5) firmly, remove power cable nut (6) and threadless
washer (7).
WARNING
Do not remove test arming pin and keep open end of barrel pointed m a safe direction
towards ceiling, floor, or safe wall. Removal of test arming pin will release main spring,
expelling plunger with sufficient force to cause serious injury to personnel.
(12) Carefully remove entire power cable assembly (8) from FF-2 Release (2) and set it aside.
2-40