TM 10-3510-209-24
2-47. DRYER UV SCANNER AND FLAME SAFEGUARD ASSEMBLY (CONT)
INSTALLATION (Cont)
2.
Route the wires of UV scanner (10) through the
conduit to the electrical panel.
3.
Install UV scanner (10) in conduit connector (13)
and tighten two clamps (12).
4.
Install UV scanner (10) on burner cover (11).
5.
Connect electrical wires (8) to the terminals on
the electrical panel and install screws (7).
Remove tags.
6.
Install purge timing card (20) on flame safeguard
control chassis (6) if the card is packed
separately.
7.
Install flame safeguard control chassis (6) in
base (9) and tighten two screws (5).
8.
Install cover (4) on flame safeguard control
chassis (6) and secure with screw (3) in center
of cover (4).
9.
Install cover (2) on the dryer electrical panel.
10.
Open fuel shutoff valve (1).
NOTE
FOLLOW-ON MAINTENANCE:
Install dryer bin (TM 10-2510-209-10).
Install tarp assembly (TM 10-3510-209-10).
2-171