TM 10--3510--221--24
0152 00--1
INLET A WATER CONTROL VALVE
REPLACEMENT
0152 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit
Sealant, Pipe Thread (Item 6, WP 0271 00)
Tags (Item 9, WP 0271 00)
Tape, Anti--Seizing (Item 10, WP 0271 00)
Gasket, Sanitary (Qty 3) (Item 7, WP 0275 00)
Strap, Tie Down (Item 14, WP 0275 00)
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanics (Item 1, WP 0272 00)
Water must be drained from water tanks
(WP 0114 00).
Air pressure must be vented (WP 0113 00).
REMOVAL
1. Remove inlet B manifold (WP 0151 00).
2. Remove cap (1) from inlet A manifold (2).
3. Tag and disconnect tubes (3) from elbows (4) on three control valves (5).
4. Remove two screws (6) and lock washers (7) securing support leg (8) to water tanks (9).
5. Remove two screws (10), flat washers (11), and nuts (12) then remove support leg (8) from ISO frame
(13).
6. Loosen clamp (14) then pull hose (15) off of inlet A manifold (2).
7. Cut tiedown straps securing tubes (3) to inlet A manifold (2).
8. Remove three clamps (16), then pull inlet A manifold (2) out from under water tanks (9).
9. Remove and discard gaskets (17) from inlet A manifold (2).
10. Unthread faulty control valve (5) from inlet A manifold (2).
11. Unthread adapter (18) from control valve (5).
12. Unthread two elbows (4) from control valve (5).
13. Clean anti--seizing tape from threads of elbows (4).
14. Clean pipe thread sealant from threads of inlet A manifold (2), and adapter (18).
