TM 10--3510--221--24
0202 00--2
CHECK VALVE REPLACEMENT -- Continued
0202 00
INSTALLATION
1. Apply anti--seizing tape to threads of new check valve (7).
2. Thread check valve (7) into air tank (4) with direction arrow (8) pointing towards air tank.
3. Thread connector (6) onto check valve (7).
4. Connect tube (5) to connector (6).
5. Use maintenance menu to test air system (WP 0010 00). After air system is pressurized audibly check for air
leaks.
6. Close access door (2) and secure by engaging two latches (1).
END OF WORK PACKAGE