TM 10--3510--221--24
0205 00--1
PRODUCT PRESSURE REGULATOR
REPLACEMENT
0205 00
THIS WORK PACKAGE COVERS:
Removal, Installation, Adjustment
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit
Tape, Anti--Seizing (Item 10, WP 0271 00)
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanics (Item 1, WP 0272 00)
LADS power shut off at main control
enclosure (WP 0112 00).
REMOVAL
1. Disengage two latches (1), then open access door (2).
2. Close manual valve (3).
3. Open petcock (4), allow product air to vent, then close petcock.
4. Loosen screw (5), then disconnect electrical connector (6) from pressure sensor(7).
5. Disconnect tubes (8 and 9) from tee (10).
6. Disconnect union (11) to remove pressure regulator (12).
7. Unthread nipple (13) from elbow (14).
8. Unthread hex bushing (15) from pressure regulator (12).
9. Unthread hex bushing (16) from pressure regulator (12).
10. Unthread hex bushing (17) from pressure regulator (12).
11. Clean anti--seizing tape from threads of nipple (13) and hex bushings (15, 16, and 17).
1
2