TM 10--3510--221--24
0221 00--2
OVERLOAD RELAY REPLACEMENT --
Continued
0221 00
INSTALLATION
1. Insert new overload relay (1) into contactor (3), then secure by tightening three screw terminals (2).
2. Connect wires to overload relay (1) as tagged.
3. Set reset control (4) to MO.
4. Adjust amperage control (5) to setting as follows:
a. For overload relays OL101A and OL101B adjust amperage control to 6.2.
b. For overload relay OL105 adjust amperage control to 3.
c. For overload relay OL201 adjust amperage control to 2.6.
5. Turn handle (6) CW, then close door (7).
6. Secure door (7) to main control enclosure (8) by tightening eleven latches (9).
7. Using maintenance menu control outputs function (WP 0010 00) verify correct operation as follows:
a. For overload relay OL101A test operation of water pump M101A.
b. For overload relay OL101B test operation of water pump M101B.
c. For overload relay OL105 test operation of water supply pump M105.
d. For overload relay OL201 test operation of distillate pump M105.
END OF WORK PACKAGE