TM 10--3510--221--24
0221 00--1
OVERLOAD RELAY REPLACEMENT
0221 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit
Tags (Item 9, WP 0271 00)
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanics (Item 1, WP 0272 00)
LADS power must be shut off and door opened at
main control enclosure (WP 0112 00).
REMOVAL
1. Tag and disconnect wires from overload relay (1).
2. Loosen three screw terminals (2), then pull overload relay (1) off of contactor (3).
5
4
1
2
3
9
7
6
8