TM 10--3510--221--24
0220 00--1
3--PHASE CONTACTOR REPLACEMENT
0220 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit
Tags (Item 9, WP 0271 00)
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanics (Item 1, WP 0272 00)
LADS power must be shut off and door opened at
main control enclosure (WP 0112 00).
REMOVAL
1. Tag and disconnect wires from contactor (1) and overload relay (2).
2. Loosen three screw terminals (3), then pull overload relay (2) off of contactor (1).
3. Pull out on locking tab (4), then remove contactor (1) from mounting rail (5).
4
3
1
2
9
8
7
6
5