TM 10-3510-224-13&P
0008 00
Procedure 1: Loss of Power
INITIAL SETUP:
Equipment Condition:
Materials/Parts
CSSL set-up, but not in operation
None
Maintenance Level
Operator
IS POWER SOURCE CONNECTED TO
CSSL OUTSIDE POWER ENTRY PANEL?
HAVE MOS 51R, 52C, 52D, OR 52G
QUALIFIED PERSONNEL CONNECT
POWER SOURCE. ATTEMPT TO START
APPLIANCES. IF STILL INOPERATIVE,
CONTINUE PROCEDURE.
SET BOTH MAIN CIRCUIT BREAKERS TO
ON. ATTEMPT TO START APPLIANCES.
IF STILL INOPERATIVE, CONTINUE
PROCEDURE.
ARE INDIVIDUAL CIRCUIT BREAKERS IN
BOTH POWER DISTRIBUTION PANELS SET
TO ON ?
SET INDIVIDUAL CIRCUIT BREAKERS TO
ON. ATTEMPT TO START APPLIANCES. IF
STILL INOPERATIVE, CONTINUE
PROCEDURE.
SET AND ADJUST COMPONENT
OPERATING CONTROLS TO THE
DESIRED MODE OF OPERATION (ON/
OFF, HEATER CONTROL, etc.) ATTEMPT
TO START APPLIANCES. IF STILL
INOPERATIVE, CONTINUE PROCEDURE.
IF APPLIANCES ARE STILL INOPERATIVE
NOTIFY UNIT MAINTENANCE
NO
YES
ARE MAIN CIRCUIT BREAKERS (# 10) IN
BOTH LEFT AND RIGHT POWER
DISTRIBUTION PANELS SET TO ON ?
NO
NO
NO
YES
YES
YES
ARE EQUIPMENT OPERATING CONTROLS
PROPERLY SET OR ADJUSTED?
0008 00-2