TM 10-3530-207-14
5-27. CLOTHING SEWING MACHINE FRONT BUSHING MAINTENANCE.
This task covers:
a.
Removal
b.
Cleaning
c.
Inspection
d.
Repair
e.
Installation
INITIAL SETUP :
Tools:
Material/Parts:
General Mechanics Tool Kit (Appendix B,
Cleaning Solvent (Appendix F, Item 8)
Item 1)
Brush, Medium Bristle (Appendix F, Item 1)
Equipment Condition:
Rag, wiping (Appendix F, Item 2)
Crank Rod assembly
removed (para. 5-22)
Removal.
(1) Remove setscrews (1 and 2) through machine casing (4).
(2) Using long brass punch, tap bushing (3) out of the machine casing (4).
5-65