Section II. SHOWER STAND AND PUMP ASSEMBLY
This section describes the direct support maintenance
requirements for the shower stand riser, the water pump
a. . Inspection, Removal and Installation. Refer to
assembly frame, and the electrical conduit.
b. Repair. Straighten bends and weld all cracks
and breaks in the pump frame.
The shower stand riser is used to support the shower
stand head and legs when the stand is set up for
operation.
Fabricate a water pump motor conduit tube 12/4 inches
long from the bulk metal conduit (1/2 in. by 10 ft) to
a. Removal, Inspection and Installation. Refer to
replace a defective water pump motor conduit tube.
This tube is fabricated by the direct support
b. Repair. Straighten and weld broken leg inserts
maintenance personnel to be used by organizational
and broken soap tray. Use a pipe die to repair damaged
personnel to replace a defective tube.
threads.
Section III. WATER HEATER ASSEMBLY
indicates on figure 6-2A. If the meter indicates an
infinite resistance (needle stays at extreme limit of
This section describes the direct support and .general
maximum resistance), the winding is open circuited. If
support maintenance instructions for the water heater
the meter indicates zero resistance, the winding is short
components which include the pressure and
circuited. If the winding is in good condition, the meter
temperature control, handles, skid, tank, fuel pump,
reading should correspond to the resistance value of the
conduit, and transformer.
winding specified in figure 6-2A.
(2) Ground test. Test the primary winding for
Installation.
Refer
to
a. Removal
and
a possible ground by connecting the meter between the
transformer core and one of the windings as indicated in
figure 6-2B. An infinite resistance reading means that
b. Test. Use an
ohmmeter to
test the transformer
the winding is not grounded and zero resistance means
for defective wiring. Make the continuity and
that the winding is grounded at some point near the
ground tests according to the following procedures:
terminal where one of the test leads is connected.
continuity by performing the tests (Ti, T2, and T3) as