TM 10-3510-220-24
2-28.
PRE-EXTRACTION BIN
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
General mechanics tool kit
Personnel Required
Two
Equipment Condition
TM 10-3510-220-10, Drain hose disconnected
from bin assembly.
REMOVAL
1.
Remove five bolts (8), flat washers (9),
lockwashers (10) and four nuts (11).
2.
Remove bin (3) from trailer (7).
INSTALLATION
1.
Position bin (3) on trailer (7) and secure
with five bolts (8), flat washers (9),
lockwashers (10) and four nuts (11).
2.
Perform follow-on installation.
Connect drain hose to bottom
fitting of bin assembly
(TM 10-3510-220-10).
2-91